No. Company / Project Name Product / Activity Annual Production Capacity Approx. Investment Approx. Employment Commissioning Year (SH)
1 Loading and Unloading Jetty Exports and Imports 6 million tonnes of mineral bulk cargo; 15 million tonnes of petroleum cargo USD 250 million 300 people 1372
2 Al Mahdi Aluminum Aluminum Ingots 110,000 tonnes USD 500 million 1,300 people 1376
3 Special Economic Zone Desalination Plant Distilled Water 1,800 m³ USD 2 million 20 people 1376
4 Bandar Abbas Zinc Plant Zinc Ingots 18,000 tonnes USD 16 million 160 people 1376
5 Hotel and Infrastructure — — USD 50 million 150 people 1384
6 Noor Vijeh Desalination Plant Fresh Water 2,500 m³ USD 3 million 10 people 1386
7 South Steel Plant Steel Billets 300,000 tonnes USD 34 million 240 people 1387
8 Hormozgan Steel Company Direct Reduction Unit Direct Reduced Iron (DRI) 1.65 million tonnes USD 300 million 1,000 people 1387
9 D18 Anode Production and Baking Line – Al Mahdi Aluminum and Hormozal Green D20 Anodes; Baked D18 Anodes 200,000 tonnes of green anodes; 75,000 tonnes of baked anodes USD 70 million 140 people 1387
10 Hormozal Aluminum Aluminum Ingots 147,000 tonnes USD 800 million 1,000 people 1388
11 Hormozgan Steel Desalination Plant Fresh Water 30,000 m³ USD 28 million 30 people 1389
12 Geno Substation and Transmission Line Electricity Transformation and Transmission 600 MW USD 40 million 40 people 1389
13 Hormozgan Steel Company Steelmaking Unit Steel Slabs 1.5 million tonnes USD 650 million 2,000 people 1390
14 South Kaveh Steel Company Direct Reduction Unit Direct Reduced Iron (DRI) 1.85 million tonnes USD 360 million 1,000 people 1391
15 400/230 kV Electrical Substation Electricity Transformation and Distribution 1,000 MW USD 45 million 40 people 1392
16 Jetty Expansion Project Exports and Imports 6 million tonnes of mineral bulk cargo USD 56 million 70 people 1392
17 D20 Anode Baking Line – Al Mahdi Aluminum and Hormozal Baked Anodes 75,000 tonnes of anodes USD 30 million 60 people 1392
18 Construction of Perimeter Wall and Road around the Expansion Site (44 km) — — IRR 770 billion — —
19 Commissioning of Phase One of the Hormoz Combined-Cycle Power Plant Electricity 160 MW EUR 46 million — 1397
20 Commissioning of the Gas Supply Unit for Power Plants at the Central Site — — IRR 420 billion — —

Investments Underway

Replace # with the PDF or Excel download URL when available. Download Table
No. Company / Project Name Product / Activity Annual Production Capacity Approx. Investment Approx. Employment Project Start Year (SH)
1 Anode Rodding Facility – Al Mahdi Aluminum and Hormozal Rodded anodes 141,000 anodes USD 48 million 50 people 1388
2 Direct Reduction Unit – Saba Gulf Steel Company Direct reduced iron (DRI) 1.5 million tonnes USD 360 million 1,000 people 1389
3 Phase 1 Steelmaking Unit – South Kaveh Steel Company Steel slabs 1.2 million tonnes USD 400 million 1,500 people 1390
4 Fooman Shimi Gostar Bitumen production and packaging 300,000 tonnes USD 55 million 300 people 1390
5 Steelmaking Unit – Saba Gulf Steel Company Steel billets 1.5 million tonnes USD 700 million 2,000 people 1391
6 Phase 1 Pelletizing Plant – Madkoush Iron ore pellets 2.5 million tonnes USD 190 million 400 people 1391
7 Phase 2 Steelmaking Unit – South Kaveh Steel Company Steel slabs 2.1 million tonnes USD 271 million 1,500 people 1392
8 Phase 1 Desalination Plant – South Kaveh Steel Company Freshwater 30,000 m³ per day USD 54 million 30 people 1387
9 Pelletizing Plant – South Kaveh Steel Company Iron ore pellets 5 million tonnes USD 70 million 140 people 1387
– Total – – 2,398 8,280 –